Spintires Wiki

To ensure the best experience, easier readability and the ease of use on mobile devices, we highly recommend using either:
  • the official desktop mode here
  • a third-party high-performance mode here.

READ MORE

Spintires Wiki
Advertisement
Spintires Wiki

Service Hub Reactivation is a contract for Morrison Mining in the Alaska region of SnowRunner.

Description[]

There is a Service Hub in Pedro Bay that requires delivery of some cargo to make it operational.

Objective[]

  • Deliver to the Port:
    • Consumables x2
    • Concrete Blocks x2

Tips[]

  • Almost the entire route can be traversed on icy and snowy tarmac, so use appropriate tires and drive slowly.
  • Concrete Blocks can be easily obtained from the Warehouse Loading on the Southeastern corner of the map, whereas Consumables are avaliable at Factory Loading but requires prior completion of Moving The Stock.
  • Any truck that can mount a loading crane with slots for two units of cargo and the ability to haul a trailer simultaneously is recommended. A sideboard trailer is the best choice as it's relatively light and can be found easily in North Port or White Valley.
    • The Concrete Blocks are much heavier than the Consumables, loading the former on your truck instead of on the trailer improves the handling.
Advertisement